Vietnam War Timeline



Previous Date     Timeline Index    December Index    Next Date

238
5 December 1968
1/35th
Submitted by: Dave Fogg

3rd Bde 4th Inf Div
Bn (1/35) Forward Fire Base
LZ Joan, Duc Co, YA 844252

Unit Locations:
A 1/35 LZ Joan YA844252
B 1/35 OPCON to 2/8
C 1/35 (-) LZ Betty YA905505
D 1/35 (-) OPCON to 2/8
D Co Mortars (-) LZ Joan
Recon Plt LZ Lanetta YA855458
4.2 Mortar Plt (-), LZ Joan

Summary: Log opened at 0001 hours 5 December 1968. Unit locations: At LZ Joan YA841251, Battalion Headquarters (Forward), A Company 1/35, C Battery 2/9 Artillery, E Company (-), Counter Mortar Section 2/9 artillery; 1st Platoon D Co 4th Engineers Battalion, Mobile Dental Clinic from the 4th Medical Battalion; At LZ Betty YA902503; C Company 1/35, 1 CSF platoon from the new Plei Djerang Special Forces Camp, At LZ Lanetta YA853457; E Company Recon platoon; At grid ZA195354 B Company OPCON to 2/8 Inf; At ZA181303 D Company OPCON to 2/8 Inf; At LZ Oasis; Headquarters and Headquarters Company Support (S-4 Forward); At Base Camp (Camp Enari); Battalion Headquarters (Rear).

B & D Companies passed their OPCON from 2/8 Inf to 1/69 Armor. B Company will return to the control of the 1/35 Inf 6 December 1968. Company will make a C/A from their night location grid ZA045354 to grid YA762492 to build a new firebase, the firebase to be called Marietta. D Company will pass OPCON from 1/69 Armor to 2/1 Cav 6 December 1968 for a Division operation. 3rd platoon D Company 4th Engineer's battalion changed places with the 1st platoon on LZ Joan, this occurring 3 December 1968.

1850 hours (C) From Major Royal: He would like to know if the LRRPs are still in the area of the new firebase. Would like to have them on the battalion push at 0800 hours tomorrow so that they can be contacted as we go over the area. The LZ will be called LZ Marietta. LZ named for B Co 1SG wife, CO already has one for his girl friend.


Previous Date    Timeline Index    December Index    Next Date
\