Previous Date
Timeline Index
November Index
Next Date
219 15 November 1968
1/35th
Submitted by: Dave Fogg
3rd Bde 4th Inf Div
Bn (1/35) Forward Fire Base
LZ Joan, Duc Co, YA 844252
Unit Locations:
A 1/35 LZ Vera, OPCON to 3/8 YA838178
B 1/35 (-) LZ Joan, YA 844252
C 1/35 (-) LZ Jean, YA 809234
D 1/35 (-) LZ Jean, YA 809234
Recon Plt LZ Joan YA844252
4.2 Mortar Plt, LZ Joan
Summary: Log opened at 0001 hours 15 November 1968. Unit locations: At LZ Joan YA841251, Battalion Headquarters (Forward), B Company 1/35, C Battery 2/9 Artillery, C Battery (-) 5/16 Artillery, E Company, Counter Mortar Section 2/9 artillery; 1st Platoon D Co 4th Engineers Battalion, At LZ Jean YA809234; C Company 1/35, D Company 1/35, 1 CSF platoon from the Special Forces Camp at Duc Co, 1 AN/TPS-25 section from Division artillery; At LZ Vera YA807232, A Company 1/35 OPCON to 3/8 Infantry; At LZ Oasis; Headquarters and Headquarters Company Support (S-4 Forward); At Base Camp (Camp Enari); Battalion Headquarters (Rear). No significant activities occurred during the reported period. C Company was put on a 30-minute standby in response to an operation to start at 0600 hours 16 November 1968. The Bn was put on the same standby for the same operation.
Previous Date
Timeline Index
November Index
Next Date
|